Village Projects

Page last updated August 7, 2017

Below is a list of Village projects that have been proposed, discussed, reviewed and/or approved by the Village and the status of each.

2017 Road Program – Chip Seal Project

About the Project:  Project involves approximately 31,000 S.Y. of granite chip seal, crackfilling, pavement marking removal, traffic control and erosion control.  Project also includes traffic signals, pedestrian accommodations and green infrastructure.  Project affects the following Village streets:  East Wolf Run, Maple Ave from East Wolf Run to Maple Ct.

Contractor:  Scott Construction Inc.

Contact:  Ron Bittner, Village of Mukwonago Department of Public Works, (262) 363-6447 and Rebecca AlongeRuekert & Mielke, (262) 542-5733

Status: Construction started August 7, 2107 and will continue through October 31, 2017. Surface course of asphalt and final restoration will occur in summer of 2018.


2017 Street Program Project

About the Project: Project involves approximately 23,000 S.Y. of asphalt pavement pulverizing, 5,500 tons of asphaltic concrete pavement overlay, approximately 1,500 L.F. of concrete curb and gutter replacements, 10,400 S.F. of new concrete sidewalk, 5,500 S.F. of sidewalk/curb ramp replacements, storm structure rehabilitation, 100 L.F. of water main replacement, erosion control, traffic control and surface restoration.  Project affects the following Village streets:  Lincoln Avenue, Oakland Avenue, Clarendon Street, Bryant Street, and Division Street.  Project also involves the installation of a sidewalk on the south side of CTH NN (W. Veterans Way) from high school to STH 83.

Contractor:  Stark Pavement Corp.

Contact: Violet Razo, Ruekert & Mielke, (262) 542-5733, or Ron Bittner, Village of Mukwonago Department of Public Works, (262) 363-6447

Status: Project bid was awarded on July 18, 2017.  Construction schedule has not yet been set.


Chapman Farms Boulevard Project

About the Project:  New road construction on the west side of STH 83 and will intersect STH 83 and Black Bear Blvd.

Contractor:  Musson Bros.

Contact:  Violet Razo, Ruekert & Mielke, (262) 542-5733

Status: Bid was awarded on July 5, 2017.  Construction schedule has not yet been set.


Tax Incremental District #4

About the Project: Tax incremental district proposed as a mixed-use district.  TID 4 Proposed Project Plan – Updated 7-24-17

Information:  Below are some resources regarding Tax Incremental Financing (TIF).

Contact:  John Weidl, Village Administrator/Economic Development Director, (262) 441-0186

Status: Preliminary approval by Plan Commission on June 13, 2017.  Joint Review Board review on June 29, 2017.  Public hearing and final approval by Plan Commission on July 11, 2017.  The Village Board will consider the plan on August 15, 2017.  The Joint Review Board will consider the plan on September 6, 2017.


Wells 3 and 4 Generator Additions Project

About the Project:  Project involves adding outdoor standby generator units at two existing water pump stations.

Contractor:  NEXT Electric Inc.

Contact:  Violet Razo, Ruekert & Mielke, (262) 542-5733, or Dave Brown, Village of Mukwonago Water Utility, (262) 363-6416

Status:  Under Construction.


Wolf Run Signalization Project

About the Project:  Project involves traffic signal system installation at the intersection of Wolf Run and STH 83.  At the intersection of Arrowhead Drive and STH 83 there will be island and pavement replacement.  The project also includes traffic control, pavement marking and signing.

Contractor:  MP Systems, Inc.

Contact:  Violet Razo, Ruekert & Mielke, (262) 542-5733

Status:  Under Construction.